Description
The Bisbee Multicoloured Chandelier with Six Opal Glass Globes is the perfect combination of art and functionality. This eye-catching fixture will serve as a bold centerpiece, infusing your living space with a vibrant personality. Its inventive and abstract design, featuring clean lines and colorful geometric shapes, takes inspiration from avant-garde artistry. The chandelier offers an effortless blend of form and function, elevating any interior space with its unique aesthetic.
A Bold and Vibrant Design
What makes the Bisbee chandelier stand out is its brilliant use of color and shape. Six meticulously crafted deconstructed pyramids intersect to create a striking angular structure. Nestled within this framework are six 15cm opal glass globes, which gently diffuse light to create a warm and welcoming ambiance. The geometric shapes are powder-coated in an array of vivid hues, including yellow, sage green, red, sapphire blue, bronze, and grey, adding a pop of color to any room. To complete the look, the ceiling rose and the suspension chain are finished in a soft golden tone, enhancing the overall sophistication of the piece.
Perfect Dimensions for a Strong Presence
The Bisbee chandelier has been designed to make an impact without overwhelming the room. It boasts a diameter of 59cm and a height of 46.2cm, striking the ideal balance between size and style. When paired with the standard 80cm cable and chain, the overall height of the fixture extends to 125.7cm, making it suitable for a variety of ceiling heights. From modern lofts to eclectic interiors, this chandelier adapts effortlessly, adding a unique and artistic flair to your home.
| Height |
46.2cm |
| Diameter |
59cm |
| Standard Cable/Chain Length |
100cm |
| Material |
Brass, Steel |
| IP Rating |
IP20 |
| Light Bulb Base |
E27 |
| Max Wattage |
40W |
| Number of Bulbs Required |
6 |
Mullan Delivery & Finishes
Delivery: All Mullan Lights are assembled to order and finished as requested.
Brass & Glass Lights will take 15 - 21 working days, however the factory will try and complete orders a little sooner where possible, but all orders are dealt with in strict rotation.
Ceramics each piece is handcrafted at the time of the order, so these can take 4-5 weeks depending on complexity. Again they will be supplied as quickly as possible.
Mullan Brass Light Finishes & Colours
Each light is shown with its finish options, however we can often have lights finished in a powder coat finished in one of the colours or the Chrome finish, however there maybe a charge for this and delivery will be extended by several weeks.
All brass fittings are lacquered with exception of the 'Natural Brass'. We can request they are unlacquered if you prefer.
Mullan's products are hand finished therefore each item is unique. The colours shown below are intended as an indication only and some variation is to be expected - see Below.
Many of the brass lights can also be finished in a powder coated colour finish, see below.
Brass Finishes
Antique Brass , Antique Silver, Polished Brass, Satin Brass Satin Chrome, Polished Chrome






Powder Coated Colours incl.
Powder Coated Chrome, Power Coated Gold, Powder Coated Bronze,



Yellow, White, Sage Green, Grey, Matt Black





Orange, Red, Racing Green, Gloss Black




For full details see Mullan Finishes Page
Christmas Last Orders & Deliveries
Our Brands
Mullan Lighting :
- Orders for Mullan Lights need to be made by Monday 1st December if you want them to be delivered before Christmas.
- Any orders after that date will start manufacture but may not be shipped until early January. The factory will be on Shutdown until January 2nd.
- You can still order for January delivery, as all orders are dealt with in strict rotation - so earliest in - soonest out.
Burford Lights :
- Orders for manufacture & delivery before Christmas, need to made by Wednesday 3rd December to ensure Christmas Delivery.
- Any orders after that date will start manufacture but may not be shipped until early January. The factory will be on Shutdown until January 6th.
- You can still order for January delivery, as all orders are dealt with in strict rotation - so earliest in - soonest out.
Sollux Lighting:
- Lights in stock - will be shipped up to Friday 19th December - orders not in stock can be backordered, but may not arrive before Christmas
- Any orders after that date will start manufacture but may not be shipped until early January. The factory will be on Shutdown until January 6th.
- You can still order for January delivery, as all orders are dealt with in strict rotation - so earliest in - soonest out.
All factories are closed over the holiday period - returning from Monday 6th January 2026
We will be on limited service during the holiday period - however orders will be taken and put into the queue in strict rotation to ensure all is fair, deliveries will restart after 6th January.