Description
The Bog Oak marbled ceramic wall light is simplistically elegant. The circular design of the Bog Oak is complemented by smooth curved edges. Measuring 28cm in diameter, the Bog Oak ceramic wall lamp is an endearing addition to any interior space. Beautifully dressing both industrial and vintage interiors, this marble effect wall light acts as a central focal point on bare walls. The Bog Oak ceramic wall light teases the display of grey and black hues across the off-white backdrop of the ceramic shade. The Bog Oak ceramic wall light has an enchanting appearance and is best paired with a large round decorative, filament bulb. Expect a soft glow of light from this edgy ceramic design. The Bog Oak marbled ceramic wall light is suited to task and accent lighting. Please note that the surface of the ceramic shade is glazed (not matte). It has a glossy appearance when light is reflected on its surface. Please note that our ceramic lights are handmade in our studio in Mullan Village. As such, the exact size, colour, and texture of each piece may vary.
Mullan Delivery & Finishes
Delivery: All Mullan Lights are assembled to order and finished as requested.
Brass & Glass Lights will take 15 - 21 working days, however the factory will try and complete orders a little sooner where possible, but all orders are dealt with in strict rotation.
Ceramics each piece is handcrafted at the time of the order, so these can take 4-5 weeks depending on complexity. Again they will be supplied as quickly as possible.
Mullan Brass Light Finishes & Colours
Each light is shown with its finish options, however we can often have lights finished in a powder coat finished in one of the colours or the Chrome finish, however there maybe a charge for this and delivery will be extended by several weeks.
All brass fittings are lacquered with exception of the 'Natural Brass'. We can request they are unlacquered if you prefer.
Mullan's products are hand finished therefore each item is unique. The colours shown below are intended as an indication only and some variation is to be expected - see Below.
Many of the brass lights can also be finished in a powder coated colour finish, see below.
Brass Finishes
Antique Brass , Antique Silver, Polished Brass, Satin Brass Satin Chrome, Polished Chrome






Powder Coated Colours incl.
Powder Coated Chrome, Power Coated Gold, Powder Coated Bronze,



Yellow, White, Sage Green, Grey, Matt Black





Orange, Red, Racing Green, Gloss Black




For full details see Mullan Finishes Page
Christmas Last Orders & Deliveries
Our Brands
Mullan Lighting :
- Orders for Mullan Lights need to be made by Monday 1st December if you want them to be delivered before Christmas.
- Any orders after that date will start manufacture but may not be shipped until early January. The factory will be on Shutdown until January 2nd.
- You can still order for January delivery, as all orders are dealt with in strict rotation - so earliest in - soonest out.
Burford Lights :
- Orders for manufacture & delivery before Christmas, need to made by Wednesday 3rd December to ensure Christmas Delivery.
- Any orders after that date will start manufacture but may not be shipped until early January. The factory will be on Shutdown until January 6th.
- You can still order for January delivery, as all orders are dealt with in strict rotation - so earliest in - soonest out.
Sollux Lighting:
- Lights in stock - will be shipped up to Friday 19th December - orders not in stock can be backordered, but may not arrive before Christmas
- Any orders after that date will start manufacture but may not be shipped until early January. The factory will be on Shutdown until January 6th.
- You can still order for January delivery, as all orders are dealt with in strict rotation - so earliest in - soonest out.
All factories are closed over the holiday period - returning from Monday 6th January 2026
We will be on limited service during the holiday period - however orders will be taken and put into the queue in strict rotation to ensure all is fair, deliveries will restart after 6th January.