Description
NORANO Ceiling Light
Unusually long arms, deep black color, and adjustable light direction are the characteristic features of the NORANO collection ceiling lights. Minimalistic yet extremely functional, they will surely appeal to fans of practical solutions.
Adjustable Light Direction
You can decide where the light beam should fall thanks to the movable shades. You can choose a version with one light point for smaller rooms or two for larger spaces.
Design That Will Suit Many Interiors
NORANO will fit perfectly into a raw, industrial atmosphere, complement a loft interior with its black color, or hang in a modern yet elegant office. The lamps from this collection will not dominate the room decor but will subtly and stylishly complement it.
Proudly Made in Poland
The entire production process of Sollux lamps takes place in Poland, with attention to every detail. Thanks to this, you can enjoy their exceptional durability and have the NORANO ceiling light in your interior for many years.
Timeless Black
Classics never go out of style, just like NORANO lamps. The deep black with chrome inserts fits many decor styles, so even if you decide to rearrange your interior, the NORANO ceiling light will still beautifully illuminate it.
Light for Every Room
The NORANO ceiling light will successfully hang in the kitchen, living room, and bedroom. As many ideas as possibilities! With Sollux lamps, you can use them all!
Feel the Loft Atmosphere in a Modern Edition!
Sollux Lighting & Delivery
Delivery: Most Sollux Lights are available from a UK or EU warehouse in 5 - 14 days, Longer deliveries on specific products are shown in the 'Additional Information' tab.
All these lights are made in EU.
Sollux Lighting
Manufactured in the EU, by crafts people, design led, quality light fittings in a variety of modern styles to suit homes, apartments , offices and commercial premises.
Christmas Last Orders & Deliveries
Our Brands
Mullan Lighting :
- Orders for Mullan Lights need to be made by Monday 1st December if you want them to be delivered before Christmas.
- Any orders after that date will start manufacture but may not be shipped until early January. The factory will be on Shutdown until January 2nd.
- You can still order for January delivery, as all orders are dealt with in strict rotation - so earliest in - soonest out.
Burford Lights :
- Orders for manufacture & delivery before Christmas, need to made by Wednesday 3rd December to ensure Christmas Delivery.
- Any orders after that date will start manufacture but may not be shipped until early January. The factory will be on Shutdown until January 6th.
- You can still order for January delivery, as all orders are dealt with in strict rotation - so earliest in - soonest out.
Sollux Lighting:
- Lights in stock - will be shipped up to Friday 19th December - orders not in stock can be backordered, but may not arrive before Christmas
- Any orders after that date will start manufacture but may not be shipped until early January. The factory will be on Shutdown until January 6th.
- You can still order for January delivery, as all orders are dealt with in strict rotation - so earliest in - soonest out.
All factories are closed over the holiday period - returning from Monday 6th January 2026
We will be on limited service during the holiday period - however orders will be taken and put into the queue in strict rotation to ensure all is fair, deliveries will restart after 6th January.